021 081 89666

Auckland concreters · Pakuranga based

Rock-solid concrete for Auckland builds.

Commercial, industrial and residential concrete placing, finishing and civil works. Precision. Power. Performance.

  • 17 yearsIn the concrete trade
  • 20 / 25 MPaConcrete, 100 or 150 mm
  • Mon–Sat7am to 5pm
  • Auckland +Waikato, Tauranga, Whangārei

What we pour

Concrete work, start to finish

From subgrade to saw cut. Driveways, council crossings, foundations and commercial floors, placed and finished by one crew.

Newly poured residential driveway with timber boxing

Driveways

Residential and heavy-vehicle driveways, boxed, reinforced and finished.

Poured footpath and vehicle crossing beside the kerb

Footpaths & crossings

Council vehicle crossings and access ramps to Auckland Transport frameworks.

Large commercial warehouse slab floor

Commercial floors

Large slabs and accessways, power-trowelled to a machine-burn finish.

Freshly finished foundation slab

Foundations & slabs

Structural foundations built to your engineer's layout.

Exposed aggregate concrete surface

Exposed aggregate

A tough, slip-resistant surface for drives and paths.

Red coloured concrete path edged in white

Coloured concrete

Oxide colours for paths, crossings and feature areas.

Block retaining wall under construction

Retaining walls

Built to hold ground and stay straight.

How a pour runs

Four steps. No shortcuts.

01

Excavate & box

Subgrade excavated, timber boxing set to level, base metal aggregate compacted.

Formwork and reinforcement laid out before the pour
02

Reinforce

Steel mesh set on chair supports so it sits where the engineer wants it.

Steel mesh on blue chair supports
03

Pour

Concrete placed and screeded to depth. Weather slots held with the batching plant.

Crew placing concrete over mesh
04

Finish & cut

Machine-finished, then control saw cut. You don't leave concrete half done.

Power trowel finishing a slab

Specification

Built to your engineering

We work to your site's layout and load requirements. Foundations, crossings and ramps follow Auckland Council and Auckland Transport frameworks, including NZS 4121:2001 accessibility.

Residential slabs & patiosStandard 20 or 25 MPa performance concrete
100 mm
Heavy-vehicle & commercialAccessways and commercial driveways
150 mm
30%Deposit when we mobilise to site
40%Progress payment before the pour
30%Final balance on completion

All rates and estimates are quoted exclusive of GST.

Concrete Soldiers work van

About us

We don't just pour concrete

We build durable, precision-engineered foundations designed to stand the test of time. Our team brings 17 years of hands-on experience across large commercial developments and custom residential projects throughout Auckland.

You can't just leave the concrete once you've started. You have to see it through to the finish, and we do, every time.

Frejoy CalapreDirector, Concrete Soldiers Limited

Questions

Before you book

What is included in your standard quote?

The full scope of work: subgrade excavation, timber boxing, base metal aggregate compaction, steel mesh on chair supports, concrete pouring, professional finishing and control saw cutting.

Are there any extra costs I should expect?

No surprises. Specialised boom pumps, decorative oxides, site waste cartage and formal Council Traffic Management Plans are excluded upfront unless you request and approve them as a variation.

How do your payment terms work?

A structured milestone schedule: 30% deposit on mobilisation, 40% before the pour and 30% on completion. All rates and estimates are exclusive of GST.

What happens if Auckland weather hits on pour day?

We hold provisional on-hold delivery slots with primary batching plants such as Holcim. If bad weather arrives we reschedule without compromising site preparation or curing quality.

What thickness and strength do you use?

We follow your engineering layout and load requirements. Our standard is 20 or 25 MPa concrete at 100 mm for residential slabs and patios, and 150 mm for heavy-vehicle accessways and commercial driveways.

Is the work compliant with Council guidelines?

Yes. Foundations, council vehicle crossings and access ramps follow Auckland Council and Auckland Transport frameworks, including NZS 4121:2001 accessibility standards.

Get a quote

Tell us about the job

To quote we need the location, size, job type and a few photos. Send what you have and we'll come back to you.

Photos help. Reply to our email with them, or send them with your request.

CallGet a quote