
Driveways
Residential and heavy-vehicle driveways, boxed, reinforced and finished.
Auckland concreters · Pakuranga based
Commercial, industrial and residential concrete placing, finishing and civil works. Precision. Power. Performance.
What we pour
From subgrade to saw cut. Driveways, council crossings, foundations and commercial floors, placed and finished by one crew.

Residential and heavy-vehicle driveways, boxed, reinforced and finished.

Council vehicle crossings and access ramps to Auckland Transport frameworks.

Large slabs and accessways, power-trowelled to a machine-burn finish.

Structural foundations built to your engineer's layout.

A tough, slip-resistant surface for drives and paths.

Oxide colours for paths, crossings and feature areas.

Built to hold ground and stay straight.
How a pour runs
Subgrade excavated, timber boxing set to level, base metal aggregate compacted.

Steel mesh set on chair supports so it sits where the engineer wants it.

Concrete placed and screeded to depth. Weather slots held with the batching plant.

Machine-finished, then control saw cut. You don't leave concrete half done.

Specification
We work to your site's layout and load requirements. Foundations, crossings and ramps follow Auckland Council and Auckland Transport frameworks, including NZS 4121:2001 accessibility.
All rates and estimates are quoted exclusive of GST.
Our work
Real jobs from our own crew. Driveways, floors, crossings and finishes.







About us
We build durable, precision-engineered foundations designed to stand the test of time. Our team brings 17 years of hands-on experience across large commercial developments and custom residential projects throughout Auckland.
You can't just leave the concrete once you've started. You have to see it through to the finish, and we do, every time.
Frejoy CalapreDirector, Concrete Soldiers Limited
Questions
The full scope of work: subgrade excavation, timber boxing, base metal aggregate compaction, steel mesh on chair supports, concrete pouring, professional finishing and control saw cutting.
No surprises. Specialised boom pumps, decorative oxides, site waste cartage and formal Council Traffic Management Plans are excluded upfront unless you request and approve them as a variation.
A structured milestone schedule: 30% deposit on mobilisation, 40% before the pour and 30% on completion. All rates and estimates are exclusive of GST.
We hold provisional on-hold delivery slots with primary batching plants such as Holcim. If bad weather arrives we reschedule without compromising site preparation or curing quality.
We follow your engineering layout and load requirements. Our standard is 20 or 25 MPa concrete at 100 mm for residential slabs and patios, and 150 mm for heavy-vehicle accessways and commercial driveways.
Yes. Foundations, council vehicle crossings and access ramps follow Auckland Council and Auckland Transport frameworks, including NZS 4121:2001 accessibility standards.
Get a quote
To quote we need the location, size, job type and a few photos. Send what you have and we'll come back to you.